Subscribe
29 September, 2026 30 min read Aigars Silkalns

32 Best React Admin Dashboard Templates 2026

React still dominates the frontend landscape, and admin dashboards are one of its strongest use cases. The component model, the ecosystem of UI libraries, and the sheer number of developers building with it mean you’ve got more free admin template options than any other framework. The challenge isn’t finding a React dashboard — it’s picking the right one from an overwhelming sea of options.

Curious what React powers in the real world? Browse real-world React examples — actual apps, websites, and open-source projects built with React.

We reviewed dozens of GitHub repositories and commercial marketplaces to find the 32 best React admin dashboard templates available right now. The list kicks off with nine premium DashboardPack templates for teams that need production-ready polish out of the box, followed by 20 free open-source options sorted by GitHub stars, and closes with three of the most popular premium multi-framework templates — Metronic, Vuexy, and Velzon. The UI library diversity is impressive: shadcn/ui, Material UI, Ant Design, Tailwind CSS, Chakra UI, Bootstrap, and headless options — so whatever design system your team prefers, there’s a React admin panel that fits.

Whether you’re building an internal tool, prototyping a SaaS admin panel, or need a foundation for a client project, one of these will save you weeks of boilerplate work. Premium options come first, followed by free templates sorted by GitHub stars so you can quickly gauge community adoption.

Quick Picks

  • Best overall: Apex — 216 prerendered pages, twelve dashboard variants, shadcn/ui + Next.js 16, covers every admin use case
  • Best Next.js premium: Admindek Dashboard Next.js — Multi-niche layouts (analytics, CRM, project, eCommerce) with App Router and shadcn/ui
  • Best full React app: Haze Dashboard — 96 pages, 8 interactive modules (chat, mail, kanban, calendar) built on Next.js 16 + shadcn/ui
  • Best free: Ant Design Pro — 37.9k GitHub stars, enterprise-grade framework backed by Alibaba
  • Best premium for niche verticals: Ember — Healthcare-specific with 50+ pages covering clinical and admin workflows
  • Best with MUI: Devias Kit — The benchmark for free Material Design admin templates, featured on MUI Store
  • Best with shadcn/ui: Shadcn Admin — Fastest-growing React dashboard on GitHub with Cmd+K search and RTL support
  • Best for enterprise: React Admin — 180+ composable components, pluggable backend adapters, battle-tested in thousands of apps

React Dashboard Template Comparison

Before diving into the full reviews, here’s a side-by-side comparison of the top templates across key decision factors. Star counts are approximate and change over time.

TemplateUI LibraryTypeScriptNext.jsAuth Built-inDark ModeGitHub StarsPrice
Apexshadcn/ui✅✅ v16✅ 2FA✅—$69+
Signalshadcn/ui✅✅✅ 2FA✅—$69+
Ant Design ProAnt Design✅❌✅✅37.9kFree
RefineAny (headless)✅✅✅✅34.1kFree
React AdminMaterial UI✅❌✅✅26.5kFree
Shadcn Adminshadcn/ui✅❌ (Vite)❌✅11.1kFree
Devias KitMaterial UI✅✅✅✅5.6kFree
CoreUI ReactBootstrap 5✅❌❌✅4.9kFree
TremorRadix + Tailwind✅✅❌✅3.2kFree
Horizon UIChakra UI✅❌❌✅2.8kFree
TailAdmin ReactTailwind CSS✅❌ (Vite)❌✅1.1kFree
Berry MUIMaterial UI✅❌✅✅2.1kFree

Key takeaway: Every template on this list supports TypeScript and dark mode — those are table stakes in 2026. The real differentiators are Next.js support (critical for SSR/SEO), built-in authentication (saves weeks of development), and your team’s UI library preference. If you need Next.js + auth out of the box, your best options are Apex (premium), Refine (free framework), or Devias Kit (free template).

Premium React Admin Dashboard Templates

1. Apex

Apex - Next.js 16 React admin dashboard with 216 prerendered pages and shadcn/ui
React + Next.js 16 + shadcn/ui
$69+
Best for: Full-featured admin panels needing every page type

Why we like it: Five dashboard variants, 216 prerendered pages, live theme customizer, and 35 shadcn/ui primitives make it the most comprehensive option on this list.

Editor’s Pick — The sheer breadth of pages means you can ship a complete admin panel without building a single custom view. The live theme customizer and five vertical-specific layouts put it ahead of every other option here.

The most comprehensive React admin dashboard on this list, Apex delivers 216 prerendered pages across twelve dashboard variants (Overview, Analytics, eCommerce, CRM, SaaS, Project, Finance, HR, Marketing, Academy, Logistics and AI Usage). Built on Next.js 16 with 35 shadcn/ui primitives, it includes 20+ app pages, TanStack Table v8, Recharts 3, authentication with 2FA, a Command Palette, i18n, and a live theme customizer. If you need a dashboard that covers every conceivable use case, Apex is the one.

The sheer breadth of pages and components means you can ship a complete admin panel without building a single custom view. The live theme customizer lets stakeholders preview branding changes in real time, and the five dashboard variants give you vertical-specific layouts right out of the box. Version 3.0 adds 114 copy-paste blocks across 14 categories, six layout presets, a world map built from public-domain Natural Earth data with no runtime map library, an AI assistant with tool calls and streaming citations, and role-based access control with a permission matrix.

2. Admindek Dashboard Next.js

Admindek Next.js - Project Dashboard with Task Boards, Milestones, and Team Progress
Next.js 16 + React 19 + TypeScript 6
$69+
Best for: Real-world React admin with production data patterns

Why we like it: Server-side pagination, schema validation, and optimistic updates are wired up correctly — not just toy demos — so you can ship a real admin without reinventing the data layer.

Admindek Next.js handles the hard parts of a React admin — server-side pagination with TanStack Table v8, schema-validated forms with React Hook Form + Zod v4, optimistic updates via React 19 Actions, and clean data fetching using Next.js 16 Server Components. Built on React 19, TypeScript 6 strict mode, Tailwind CSS v4 with OKLCh tokens, and 35+ vendored shadcn/ui primitives. Nine dashboards (Analytics, CRM, E-commerce, Finance, SaaS, HR, Marketing, Crypto, Project) plus full e-commerce CRUD, kanban, calendar, chat, and 30+ pages total.

3. Signal

Signal - Terminal-inspired React DevOps dashboard for engineering teams
React + Next.js + shadcn/ui
$69+
Best for: DevOps and engineering teams

Why we like it: Terminal-inspired aesthetic with 13 infrastructure-specific views designed for engineering operations from the start.

Signal is a terminal-inspired DevOps dashboard built for engineering teams. With JetBrains Mono typography, 57+ pages, and 13 infrastructure views (Server Fleet, Containers, Deployments, Incidents, Log Explorer, Uptime Monitor, Pipelines, Databases, Security Audit, API Monitoring, Kubernetes, Cloud Costs, Status Page), it delivers a monitoring experience that feels native to the command line. Six color presets and three density modes let each team member tune the interface to their preference.

If your team lives in terminals and finds most admin dashboards too “corporate,” Signal speaks their visual language. The infrastructure-specific views mean you’re not retrofitting a generic dashboard to fit DevOps workflows — every page was designed for engineering operations from the start.

4. Flux

Flux - Gradient-forward React admin dashboard for SaaS teams
React + Next.js + shadcn/ui
$69+
Best for: SaaS and startup teams wanting visual flair

Why we like it: 300+ color combinations and Framer Motion animations give it a fluid, app-like feel that static templates can’t match.

Flux brings a gradient-forward design language to the React admin dashboard space, purpose-built for SaaS and startup teams. With 64+ pages, five dashboard variants, and 7 specialty pages (including Product Roadmap, Feature Flags, and Deployment Log), it combines visual flair with real product management tooling. Over 300 color combinations, dark/light/system themes, RTL support, a Command Palette, i18n, and 35 shadcn/ui primitives round out a polished feature set.

The gradient styling isn’t just cosmetic — it creates clear visual hierarchy across dense data layouts. Framer Motion handles page transitions and micro-interactions throughout, giving the entire dashboard a fluid, app-like feel that static templates can’t match.

5. Haze Dashboard — Next.js Edition

Premium · From $69

Haze Dashboard CRM view with deal pipeline, contact list, and stage tracking built on React 19
Next.js 16 + React 19 + TypeScript 5 + Tailwind CSS v4 + shadcn/ui
From $69
Best for: React teams that want a production-ready React 19 + Next.js admin out of the box

Why we like it: React 19 with the App Router, six CRUD resources wired to 33 mock API routes, and shadcn/ui primitives composed across 96 pages — the rare admin that doesn’t leave half the routes empty.

Most React admin templates in this list are either Material UI or Ant Design — Haze takes the shadcn/ui route, which has quickly become the default for new React projects. The template runs React 19 with Server Components and Suspense, Next.js 16 App Router with Turbopack, and TypeScript 5 in strict mode. The CRM module pictured above is one of five dashboard variants alongside Overview, Analytics, eCommerce, and SaaS, each with deal pipelines, contact lists, and stage filtering wired to mock data.

App modules go beyond the typical “dashboard + tables” pairing: chat, mail, kanban with @dnd-kit drag and drop, calendar, file manager, recharts visualizations, a Tiptap 3 rich text editor, and react-leaflet maps. Six CRUD resources (orders, products, customers, invoices, users, roles) connect to 33 mock API routes with real pagination, search, and filtering. Zustand handles state, react-hook-form + Zod handle validation, and next-intl ships English, German, and French.

6. Ember

Ember - React healthcare dashboard for medical practices
React + Next.js + shadcn/ui
$69+
Best for: Healthcare and medical admin panels

Why we like it: The only template on this list designed specifically for medical workflows, with every page mapping to a real clinical function.

Ember is a healthcare-focused React admin dashboard with 50+ pages covering Patient Management, Appointments, Vitals Monitor, Prescriptions, Lab Results, Health Records, Bed Management, Telemedicine, and Billing. The medical-specific views eliminate weeks of custom development for clinic and hospital admin panels. TanStack Table, Leaflet maps, TipTap editor, and Recharts 3 provide the underlying component infrastructure.

Authentication with 2FA, Storybook documentation, and Vitest + Playwright testing reflect production-grade engineering standards. If you’re building a healthcare admin tool, Ember is the only template on this list designed specifically for medical workflows — every page maps to a real clinical or administrative function.

7. Zenith

Zenith - Ultra-minimal React admin dashboard with shadcn/ui
React + Next.js + shadcn/ui
$69+
Best for: Brand-neutral dashboards and minimal aesthetics

Why we like it: The achromatic palette adapts to any brand without visual conflict, and Storybook docs make component exploration effortless.

Zenith takes an ultra-minimal achromatic approach to dashboard design. With 50+ routes, six dashboard variants (Overview, Analytics, eCommerce, CRM, SaaS, Finance), and 34 shadcn/ui components, it proves that restraint can be a feature. AI Chat, Kanban, Calendar, Wizard, TipTap 3, Leaflet maps, CRUD, and project management pages cover the full spectrum of admin use cases. Three density levels let you optimize for data-heavy or spacious layouts.

The black-and-white palette might sound limiting, but it creates a dashboard that adapts to any brand without visual conflict. Storybook documentation makes component exploration effortless, and the minimal aesthetic ensures the UI never competes with the data it presents.

8. Vault

Vault Dashboard - Investment Tailwind Admin Template
React + Next.js + Tailwind CSS
$69+
Best for: Investment and fintech dashboards

Why we like it: Robinhood-inspired design with 13 investment modules and Geist Mono for financial data precision.

A Robinhood-inspired investment dashboard with Plus Jakarta Sans for readability and Geist Mono for financial data precision. Ships 57+ pages spanning 13 investment modules: Portfolio, Watchlist, Market Overview, Stock Screener, Market Movers, Earnings Calendar, Dividends, Order History, Price Alerts, Analytics, Tax Center, and Stock Detail. Dark/light themes, 6 color presets, 10+ chart types.

9. Fortress

Fortress Dashboard - Finance Tailwind Admin Template
React + Next.js + Tailwind CSS
$69+
Best for: Institutional finance, trading desks, and compliance

Why we like it: Bloomberg-inspired density with 13 finance-specific pages covering multi-asset trading, risk analytics, and regulatory compliance.

A Bloomberg-inspired institutional finance dashboard built for trading desks, risk management teams, and compliance officers who need dense, data-heavy interfaces. Ships 57+ pages with 13 finance-specific pages covering multi-asset trading (Fixed Income, FX, Derivatives), risk analytics, and regulatory compliance monitoring. Framer Motion animations, Vitest + Playwright testing, and Storybook documentation.

Best Free React Admin Dashboard Templates

AdminLTE 4 for React & Next.js — Free & Official

AdminLTE 4 for React and Next.js — free official admin dashboard
React + Next.js · Bootstrap 5.3
Best for: a free, official AdminLTE dashboard in React

Why we like it: The classic AdminLTE 4 UI rebuilt as typed React and Next.js components — App Router / RSC ready, with dark mode and a ⌘K command palette.

It’s completely free and open-source under the MIT license, which makes it the obvious choice when you want the familiar AdminLTE look in a modern React or Next.js project without a license fee. Pull it from GitHub, drop in the components, and you have a working dashboard shell.

The seven premium templates above offer polished, production-ready dashboards with dedicated support and frequent updates. But the open-source React ecosystem is equally impressive. The 20 free templates below are sorted by GitHub stars so you can quickly gauge community adoption — every one ships with a working demo and is actively maintained.

10. Ant Design Pro

⭐ 37.9k GitHub Stars

Ant Design Pro - Enterprise-grade React admin dashboard with Ant Design
React + Ant Design + UmiJS
Free / MIT
Best for: Enterprise apps and teams already using Ant Design

Why we like it: Backed by Alibaba with 37.9k stars, ProComponents for rapid development, and documentation among the best in the admin template space.

The most starred React admin template in existence, and it’s backed by the Ant Design team at Alibaba. Ant Design Pro ships with 20+ business-ready pages, ProComponents for rapid form and table development, built-in i18n supporting 15+ languages, route-level access control, and TypeScript throughout. This isn’t a starter template — it’s a production-grade admin framework used by Fortune 500 companies.

The design quality and component polish reflect years of enterprise deployment at massive scale. If your team already uses Ant Design (or if your project targets Asian markets where Ant Design dominates), this is the obvious starting point. The documentation is among the best in the admin template space.

11. Refine

⭐ 34.1k GitHub Stars

Refine - Headless React framework for building admin panels with any UI library
React + Headless (any UI library)
Free / MIT
Best for: Admin panels connecting to real backends (REST, GraphQL, Supabase)

Why we like it: Headless architecture lets you use any UI library while built-in data providers handle REST, GraphQL, Supabase, Strapi, and more.

Refine isn’t a template — it’s a headless React framework for building admin panels, internal tools, and B2B apps. The “headless” part is key: it decouples business logic from UI, so you can use it with Ant Design, MUI, Mantine, Chakra UI, or any component library you prefer. Built-in data providers cover REST, GraphQL, Supabase, Strapi, Appwrite, and more.

Authentication, access control, real-time updates, and audit logging are all baked in. The CLI scaffolds CRUD interfaces in seconds. If you want maximum flexibility and your admin panel needs to connect to a real backend (not just show static charts), Refine is in a league of its own. The 34k+ stars reflect genuine production adoption, not just GitHub browsing.

Looking for admin panel options across different frameworks? Check out our roundup of the best admin templates.

12. React Admin

⭐ 26.5k GitHub Stars

React Admin - The most mature frontend framework for building admin applications
React + Material UI
Free / MIT
Best for: Enterprise admin apps that need to scale with any backend

Why we like it: 180+ composable components and pluggable data provider architecture make it the most mature React admin framework available.

Marmelab’s React Admin is the granddaddy of React admin frameworks. With 180+ composable components, REST/GraphQL API adapters, CRUD operations with optimistic updates, role-based access control, i18n, and a theming system, it’s been the go-to choice for building single-page admin applications on top of existing APIs for years.

What makes React Admin special is its data provider architecture — plug in any backend (REST, GraphQL, Firebase, Supabase, custom) and the UI layer handles the rest. The component library is massive and every piece is battle-tested in thousands of production apps. If you need a framework that grows with your project rather than a static template you’ll outgrow, React Admin delivers.

13. Shadcn Admin

⭐ 11.1k GitHub Stars

Shadcn Admin - Modern React admin dashboard with shadcn/ui and Tailwind CSS
React + Vite + shadcn/ui + Tailwind CSS
Free / MIT
Best for: Modern SaaS-style dashboards with shadcn/ui

Why we like it: Fastest-growing React dashboard on GitHub with Cmd+K search, Radix UI accessibility, and the copy-paste ownership model of shadcn/ui.

The fastest-growing React admin dashboard on GitHub, and it’s easy to see why. Built with Vite, React, and shadcn/ui, it delivers a modern, accessible interface with 10+ pages, a collapsible sidebar, global command search (Cmd+K), light/dark mode, and RTL support. TanStack Router handles the navigation, and the component quality is consistently high throughout.

Shadcn/ui’s copy-paste philosophy means you own every component — no black box dependencies. The Radix UI primitives underneath ensure accessibility isn’t an afterthought. If you want a dashboard that looks and feels like a modern SaaS product (not a generic admin panel), this is the template to beat in 2026.

For Tailwind-focused options, see our list of Tailwind admin dashboard templates.

14. Devias Kit

⭐ 5.6k GitHub Stars

Devias Kit - Professional React admin dashboard with Material UI
React + Material UI
Free / MIT
Best for: Professional MUI dashboards with auth integration

Why we like it: Featured on the MUI Store, with intentionally designed dark/light themes and clean architecture that serves as a reference for MUI projects.

Devias Kit has been a staple in the React dashboard space for years. The latest version pairs React with Material UI for a polished, enterprise-ready admin panel. The free tier gives you analytics dashboards, customer management tables, product listings, account settings, and full authentication pages with Firebase and Auth0 integration paths.

Both dark and light themes look intentionally designed, not tacked on as an afterthought. The code architecture is clean enough to serve as a reference for your own MUI projects. Featured on the MUI Store, Devias Kit has become the benchmark for what a free Material Design admin template should look like.

15. CoreUI React

⭐ 4.9k GitHub Stars

CoreUI Free React Admin Template - Bootstrap 5 powered admin dashboard
React + Bootstrap 5
Free / MIT
Best for: Teams that prefer Bootstrap over Tailwind or MUI

Why we like it: Cross-framework consistency (Angular, React, Vue, Bootstrap) and zero learning curve for Bootstrap developers.

If you prefer Bootstrap over Tailwind or Material UI, CoreUI’s React template is the most reliable option in this space. Updated to React 19, it provides 30+ reusable components, customizable layouts, multiple color themes, widgets, Chart.js integrations, and responsive sidebar navigation. The component library is hand-crafted and enterprise-grade — not just Bootstrap wrapped in React.

CoreUI exists across four frameworks (Angular, React, Vue, Bootstrap), which means the design system is mature and consistent. Teams that already know Bootstrap will find zero learning curve. A pragmatic choice for projects where familiarity and reliability matter more than chasing the latest styling trend.

16. Tremor

⭐ 3.2k GitHub Stars

Tremor - React component library for analytics dashboards
React + Radix UI + Recharts + Tailwind CSS
Free / Apache 2.0
Best for: Data-heavy analytics dashboards

Why we like it: Purpose-built for analytics with 35+ components for KPIs, charts, and data tables — the surgical tool for metrics-focused admin panels.

Tremor is purpose-built for one thing: analytics dashboards. And it does that one thing better than any other library on this list. With 35+ React components for KPI cards, line/bar/area/donut charts, data tables, and filter controls, it provides everything you need to build a data-heavy interface. The copy-paste model (like shadcn/ui) means you own the source code.

The design philosophy is “show the data, hide the chrome.” No decorative gradients, no flashy animations — just clear, readable data visualization. Built on Radix UI and Recharts with Tailwind CSS styling. If your admin panel is primarily about displaying metrics, Tremor is the surgical tool for the job. Apache 2.0 licensed.

For a broader look at Tailwind-based web templates, check out our best Tailwind CSS templates collection.

17. Material Dashboard React

Maintenance: last commit June 2024 — over two years ago. The code is still usable, but the framework has shipped major releases since, so budget time to update dependencies yourself and check anything that touches build tooling.

⭐ 3k GitHub Stars

Material Dashboard React - Free MUI admin template by Creative Tim
React + Material UI
Free / MIT
Best for: Straightforward Material Design dashboards

Why we like it: Creative Tim’s flagship free dashboard with 70+ elements, thorough documentation, and a proven production track record.

Creative Tim’s flagship free React dashboard, and one of the most downloaded admin templates period. Material Dashboard React delivers 70+ frontend elements (buttons, inputs, navbars, cards, alerts), seven example pages, dynamic chart components, and a clean Material Design aesthetic throughout. The Sass-based theming lets you customize colors and typography through variables.

It’s not the most architecturally modern template — you won’t find App Router or server components here. But the design quality is consistently high, the documentation is thorough, and Creative Tim’s templates have a proven track record in production. For a straightforward Material UI dashboard that just works, this is a dependable choice.

18. Horizon UI

⭐ 2.8k GitHub Stars

Horizon UI - Trendy React admin dashboard with Chakra UI
React + Chakra UI
Free / MIT
Best for: Crypto, web3, and fintech projects wanting a distinctive look

Why we like it: Gradient accents, glassmorphism effects, and an NFT marketplace page make it visually unique in the React dashboard space.

Horizon UI stands out with a design direction that’s genuinely different from the Material Design and Bootstrap crowd. Built on Chakra UI, it features gradient accents, glassmorphism effects, and a modern aesthetic that feels more “fintech app” than “corporate admin.” The free version includes 70+ components, an NFT marketplace page, data tables, dark/light mode, and RTL support.

The NFT marketplace page is a unique addition you won’t find elsewhere, making this particularly interesting for crypto and web3 projects. Chakra UI’s component system handles theming elegantly, and the TypeScript codebase is well-structured. If you want your admin panel to look like nothing else on this list, Horizon delivers a distinctive visual identity.

19. Mosaic Lite

Maintenance: last commit February 2025 — more than a year and a half ago. The code is still usable, but the framework has shipped major releases since, so budget time to update dependencies yourself and check anything that touches build tooling.

⭐ 2.7k GitHub Stars

Mosaic Lite - SaaS-style React admin dashboard by Cruip
React + Vite + Tailwind CSS
Free / MIT
Best for: Analytics dashboards and subscription platforms

Why we like it: Looks like a finished SaaS product out of the box — visual polish that punches well above its weight for a free template.

Cruip’s Mosaic Lite looks like a finished SaaS product out of the box — not a template. The pre-coded Chart.js 3 widgets display realistic analytics data, the layout screams “metrics dashboard for a real business,” and the overall design quality punches well above its weight for a free template. Built with React, Vite, and Tailwind CSS.

The SaaS-oriented design makes it ideal for analytics dashboards, subscription platforms, and any product where data visualization is front and center. Figma design files are available in the community for designers who want to extend the layout. If visual polish is your top priority and you want something that looks premium without the price tag, Mosaic Lite is the answer.

Need more options? Explore our comprehensive guide to free admin panels across all frameworks.

20. Minimal UI

⭐ 2.8k GitHub Stars

Minimal UI - Clean Material UI React admin dashboard
React + Material UI
Free / MIT
Best for: Client-facing admin panels where visual sophistication matters

Why we like it: Premium-looking design that rivals paid templates — properly themed MUI v7, not just default Material with a color swap.

As the name suggests, Minimal UI strips away visual clutter to let the content breathe. This Material UI dashboard focuses on clean aesthetics, generous whitespace, and refined typography. The free version provides essential dashboard components, chart widgets, user management pages, and responsive layouts with a dark mode that looks intentional rather than inverted.

The design language is premium — it looks like something you’d pay $79 for on ThemeForest. MUI v7 components are properly themed, not just default Material with a color swap. For projects where the admin panel will be seen by clients or external users (not just your internal team), Minimal UI’s visual sophistication makes a strong first impression.

21. Tabler React

Status: this React binding is no longer maintained — the repository was archived in 2022 and its last substantial release notes date to 2019. Tabler itself is thriving (41k stars and daily commits), but as an HTML and Bootstrap project, so treat Tabler React as a reference for the design language rather than a dependency for a new build.

⭐ 2.3k GitHub Stars

Tabler React - React component wrappers for the Tabler UI kit
React + Bootstrap
Free / MIT
Best for: Developers wanting Tabler’s 40k-star ecosystem in React

Why we like it: Bridges Tabler’s massive component breadth (40k+ stars for HTML version) into the React ecosystem with clean wrappers.

Tabler is one of the highest-starred dashboard UI kits on GitHub (40k+ stars for the HTML version), and Tabler React brings those components into the React ecosystem. You get charts, maps, forms, pricing cards, e-commerce elements, gallery pages, and a professional design that’s been refined over years of community feedback.

The Bootstrap foundation means the learning curve is minimal for developers who’ve worked with traditional CSS frameworks. Component wrappers are clean and follow React conventions. If you want the design quality and component breadth of Tabler’s massive ecosystem without leaving React, this is the bridge template.

22. Berry MUI React

⭐ 2.1k GitHub Stars

Berry - Free Material UI React admin dashboard by CodedThemes
React + Material UI + Redux
Free / MIT
Best for: MUI dashboards with personality and bold color choices

Why we like it: Bold color palette and refined styling give it visual warmth that generic MUI templates lack — featured on the MUI Store.

CodedThemes’ Berry brings a distinctive color palette and design approach to the Material UI dashboard space. The free version includes dark and light modes, authentication pages (Auth0/Firebase/JWT), ApexCharts integration, Redux state management, and nine demo pages with customizable color presets. Featured on the MUI Store alongside Devias Kit and Minimal UI.

What sets Berry apart from other MUI dashboards is the visual personality — it doesn’t look like default Material Design. The color choices are bold, the component styling is refined, and the overall aesthetic has a warmth that generic MUI templates lack. If you’ve seen enough gray-and-blue admin panels, Berry offers a refreshing alternative without leaving the Material ecosystem.

For Vue-based alternatives, see our roundup of the best Vue admin dashboard templates.

23. React SaaS Template

Maintenance: last commit March 2022 — over four years ago. Expect dependency conflicts on a fresh install; treat it as a design reference, or budget time to bring the stack up to date yourself.

⭐ 2k GitHub Stars

React SaaS Template - Landing page and admin dashboard in one
React + Material UI
Free / MIT
Best for: SaaS founders needing landing page + dashboard in one project

Why we like it: Combines marketing landing page, blog, account management, and admin dashboard under one consistent MUI design system.

Most templates on this list give you either a dashboard or a landing page. React SaaS Template gives you both. The package includes a marketing landing page with feature sections, a blog system, user account management, subscription/pricing pages, and the admin dashboard — all in a single project sharing the same Material UI design system.

Additional features like image cropping, emoji picker, and drag-and-drop components hint at a mature codebase that’s been used in real projects. For SaaS founders who need to ship a complete product (marketing site + app) under a consistent design, this eliminates the “match the landing page to the dashboard” problem from day one.

24. Shards Dashboard React

Maintenance: last commit January 2019 — over seven years ago. Expect dependency conflicts on a fresh install; treat it as a design reference, or budget time to bring the stack up to date yourself.

⭐ 1.8k GitHub Stars

Shards Dashboard React - Modern blog-oriented admin dashboard
React + Shards UI
Free / MIT
Best for: Content management and editorial workflows

Why we like it: Blog/content-focused layout with publishing-oriented widgets — feels more like a CMS backend than a generic admin panel.

Shards Dashboard takes a different angle with a blog/content management focused layout. The clean typography, content-centric navigation, and publishing-oriented widgets make it feel less like a generic admin panel and more like a CMS backend. Built on the Shards UI kit with a modern design system that emphasizes readability and content hierarchy.

The user profile pages, form components, and data tables round out the essential admin features. If your project involves content management, editorial workflows, or any dashboard where the primary action is creating and managing written content, Shards’ design philosophy aligns perfectly.

25. React Material Admin

⭐ 1.8k GitHub Stars

React Material Admin - Material UI dashboard by Flatlogic
React + Material UI
Free / MIT
Best for: Simple, production-ready Material Design dashboards

Why we like it: No half-finished pages or mobile breakage — a polished, straightforward admin template you can understand in an afternoon.

Flatlogic’s React Material Admin delivers a clean Material Design dashboard with chart widgets, a notification system, login/error pages, sidebar navigation, and table components. It’s less opinionated than Ant Design Pro and less sprawling than React Admin — just a solid, straightforward admin template that covers the essentials.

Flatlogic has been in the admin template business for years, and it shows in the polish. No half-finished pages, no components that break on mobile. If you want a Material UI dashboard that’s simple enough to understand in an afternoon but professional enough for production, this hits the sweet spot.

26. TailAdmin React

⭐ 1.1k GitHub Stars

TailAdmin React - Feature-rich Tailwind CSS React admin dashboard
React 19 + Vite + Tailwind CSS v4
Free / MIT
Best for: A modern, MIT-licensed React foundation

Why we like it: A genuinely modern MIT foundation — React 19, Vite and Tailwind v4 — with the same design available across five other stacks if your team spans more than one.

TailAdmin’s free React version ships one dashboard — the eCommerce one — with the supporting tables, forms, charts, calendar, profile and authentication screens, all under an MIT licence. The seven dashboard variations and the 500+ component count quoted in most roundups describe TailAdmin Pro rather than this repository; our TailAdmin free vs Pro comparison sets out the split. Built on React 19 with Tailwind CSS v4 and Vite, the tech stack is completely modern.

The 2025/2026 redesign introduced AI pages for text, image, video, and code generation tools, making it one of the few templates prepared for AI-integrated admin panels. The multiple dashboard variations mean you can pick a layout tailored to your specific business vertical. For sheer feature volume per dollar (zero dollars), TailAdmin React is hard to beat.

Exploring other CSS framework options? See our collection of Tailwind admin dashboard templates for more options.

27. Windmill Dashboard React

Maintenance: last commit July 2020 — over six years ago. Expect dependency conflicts on a fresh install; treat it as a design reference, or budget time to bring the stack up to date yourself.

⭐ 1.1k GitHub Stars

Windmill Dashboard React - Accessible Tailwind CSS admin dashboard
React + Tailwind CSS + Windmill UI
Free / MIT
Best for: Accessibility-critical projects (government, healthcare, education)

Why we like it: 100% keyboard navigable, WCAG compliant, and PWA-ready — the only template on this list that takes accessibility seriously from the ground up.

Windmill Dashboard React stands out for something most templates ignore entirely: accessibility. It’s 100% keyboard navigable, WCAG compliant, and designed with assistive technology in mind from the ground up. Multi-theme support (dark/light), responsive charts, table pagination, modals, and PWA readiness round out the feature set.

Built on the Windmill React UI component library with Tailwind CSS, the design is clean and functional without being flashy. For government projects, healthcare applications, education platforms, or any context where accessibility isn’t optional (and increasingly, that’s everywhere), Windmill is the only template on this list that takes it seriously.

28. Volt React Dashboard

Maintenance: last commit July 2023 — over three years ago. The code is still usable, but the framework has shipped major releases since, so budget time to update dependencies yourself and check anything that touches build tooling.

⭐ 998 GitHub Stars

Volt React Dashboard - Bootstrap 5 admin template by Themesberg
React + Bootstrap 5
Free / MIT
Best for: Bootstrap teams adding React to the mix

Why we like it: 100+ custom-styled Bootstrap 5 components with React abstractions — familiar foundation with modern component wrappers.

Themesberg’s Volt brings Bootstrap 5 to React with over 100 custom-styled components. Date pickers, modals, tabs, navigation bars, prebuilt dashboard pages, chart widgets, and a notification system — all extending base Bootstrap elements using Sass variables and mixins for a cohesive look. The result feels like a professionally themed Bootstrap dashboard, not a default one.

If your team is comfortable with Bootstrap’s class-based approach and you’re adding React to the mix (rather than the other way around), Volt provides a familiar foundation with React component abstractions on top. The component count is generous for a free template, and the design quality is consistent throughout.

29. Mantis React

⭐ 926 GitHub Stars

Mantis Free React Admin Template - MUI dashboard with Ant Design principles
React + Material UI + Redux Toolkit
Free / MIT
Best for: Teams wanting MUI components with Ant Design aesthetics

Why we like it: Unique blend of Material UI components with Ant Design’s design philosophy, offering the best visual elements from each.

Mantis takes an unusual approach by blending Material UI components with Ant Design’s design philosophy. The result is a dashboard that feels familiar to both MUI and Ant Design users — drawing the best visual elements from each. Redux Toolkit handles state management, ApexCharts provides data visualization, and customizable color presets let you align the dashboard with your brand.

By CodedThemes (the same team behind Berry), Mantis represents their more enterprise-focused offering. The TypeScript support is thorough, and the component architecture is clean enough to scale. A solid choice for teams that want Material UI’s component library but prefer Ant Design’s visual sensibility, closing out our list with a genuinely unique design direction.

30. Metronic React

💰 Premium ($89–$199) • 120k+ Sales

Metronic React — premium multi-framework admin dashboard with 120k+ sales, 40+ layouts, 1000+ components
React + Vue + Angular + Laravel + Django + HTML + Tailwind / Bootstrap
Premium ($89–$199 depending on tier)
Best for: Most-deployed premium dashboard

Why we like it: 120,000+ sales make Metronic the most-deployed premium admin dashboard in the React ecosystem. Ships 40+ layouts, 1,000+ components, and multi-framework editions in one purchase — React, Vue, Angular, Laravel, Django, plain HTML. Modern updates include shadcn/ui and Tailwind CSS variants alongside the classic Bootstrap layouts.

The React edition gives you the full Metronic design system — dozens of prebuilt app pages, form layouts, and chart pages — wired for a modern React + Tailwind stack. If you want one license that covers every framework your team might touch, nothing else on this list matches its breadth.

31. Vuexy Next.js

💰 Premium • Multi-Framework

Vuexy Next.js — premium React admin dashboard with 5 niche dashboards and polished design detail
Next.js + React + Tailwind + Material UI
Premium
Best for: Multi-framework polished design

Why we like it: 5 niche dashboards (Analytics, eCommerce, CRM, Logistics, Academy) with polished design detail. Multi-framework editions cover Next.js + React + Vue + Angular + HTML + Laravel. Strong typography, refined whitespace, and dashboard variants tuned for specific verticals without going as broad as Metronic.

Vuexy’s Next.js edition is one of the most design-polished premium templates you can buy — pixel-tuned components, thoughtful spacing, and vertical-specific dashboards that look finished out of the box. A great pick when visual craft matters as much as feature count.

32. Velzon React

💰 Premium • 11 Demo Styles

Velzon React — premium admin dashboard with 11 demo styles and Bootstrap 5
React + Bootstrap 5 + Redux
Premium
Best for: Bootstrap 5 with 11 demo variants

Why we like it: 11 distinct demo styles in one package — Minimal, Material, Saas, Modern, Creative, Corporate, and more. Premium React + Bootstrap 5 admin with extensive plugin coverage (calendars, kanbans, multi-language, RTL). Strong pick when you want one purchase to cover multiple potential design directions.

Velzon’s React build is the Bootstrap-5 counterpoint to the Tailwind-heavy templates above — familiar utility classes, Redux state, and nearly a dozen ready-made design directions so one license covers many project styles. A pragmatic choice for teams still standardized on Bootstrap.

How to Choose the Right React Dashboard Template

By Team Size and Budget

Solo developer or early startup: Start with a free template that matches your UI library preference — Shadcn Admin for shadcn/ui, Devias Kit for MUI, or TailAdmin React for Tailwind CSS. You’ll customize it heavily, so code ownership (MIT license) matters more than page count.

Small team (2-5 developers): Consider the premium DashboardPack templates ($69) if you need production-ready pages across multiple verticals. The time saved on building auth, chart pages, and CRUD interfaces pays for itself in the first sprint. Alternatively, Refine’s framework approach gives you maximum flexibility with zero cost.

Enterprise team (5+ developers): Ant Design Pro or React Admin provide the scaffolding, documentation, and community support that large teams need. Both have proven track records at scale — Ant Design Pro powers Alibaba’s internal tools, React Admin has been battle-tested in thousands of production apps.

By UI Library Preference

Material UI (MUI): Devias Kit (free, 5.6k stars), Berry (free, 2.1k stars), Minimal UI (free, 2.8k stars), React Material Admin (free), or React Admin (framework). MUI has the most template options on this list — seven total — reflecting its dominance in the React dashboard space.

shadcn/ui + Tailwind CSS: Apex (premium, most comprehensive), Shadcn Admin (free, 11.1k stars), or Tremor (free, analytics-focused). The shadcn/ui ecosystem is the fastest-growing in 2026, especially for premium templates.

Ant Design: Ant Design Pro (free, 37.9k stars). The clear leader if your team uses Ant Design, with enterprise features and documentation that no other Ant Design template matches.

Bootstrap: CoreUI React (free, 4.9k stars) or Volt React Dashboard (free, 998 stars). Familiar class-based styling for teams transitioning from traditional CSS frameworks.

Chakra UI: Horizon UI (free, 2.8k stars). The only Chakra UI option on this list, with a distinctive gradient-forward design.

By Project Type

SaaS admin panel: Apex (#1) or Flux (#4) for premium; Shadcn Admin (#11) or React SaaS Template (#21) for free.

Internal tool / back-office: React Admin (#12) or Refine (#11) — their framework approach handles CRUD operations and backend connectivity better than static templates.

Healthcare: Ember (#6) is the only healthcare-specific template on this list, with patient management, vitals monitoring, and telemedicine pages.

Finance / fintech: Vault (#8) for investment dashboards, Fortress (#9) for institutional finance, or Horizon UI (#18) for crypto/web3.

DevOps / engineering: Signal (#3) with its terminal-inspired aesthetic and 13 infrastructure-specific views.

Analytics / metrics: Tremor (#16) — purpose-built for data visualization with 35+ chart components.

Final Thoughts

Thirty-two templates is a lot to process, so here’s the quick decision tree. For production-ready polish with dedicated support, the premium DashboardPack templates lead the list: Apex (#1) covers every use case with 216 prerendered pages, Admindek Dashboard Next.js (#2) layers multi-niche dashboards (analytics, CRM, project, eCommerce) on App Router + shadcn/ui, Signal (#3) is purpose-built for DevOps teams, Flux (#4) brings gradient-forward SaaS styling, Haze Dashboard (#5) ships a finished React app with 96 pages and 8 interactive modules, Ember (#6) targets healthcare workflows, Zenith (#7) delivers ultra-minimal elegance, Vault (#8) handles investment dashboards, and Fortress (#9) serves institutional finance. On the free side, Ant Design Pro (#10) at nearly 38k stars has the largest community. If you need a framework that connects to any backend, Refine (#11) and React Admin (#12) are headless solutions that grow with your project indefinitely. For the most modern developer experience with shadcn/ui and Tailwind CSS, Shadcn Admin (#13) is the community favorite. And for a modern MIT-licensed React foundation at no cost, TailAdmin React (#26) pairs React 19, Vite and Tailwind v4 — noting that the 500+ component count and the seven dashboard variants quoted elsewhere belong to its Pro tier, not the free repository.

The UI library landscape has shifted noticeably: MUI still leads among the free options with seven templates, but Tailwind CSS and shadcn/ui are gaining ground fast — especially in the premium space where DashboardPack’s entries all build on shadcn/ui and Next.js. Bootstrap holds steady with three free options, and Chakra UI and Ant Design each have dedicated entries. Pick the design system your team already knows, check the live demo on mobile, and browse the source before committing. Star counts tell you about community size, not code quality — some of the lower-starred templates on this list deliver design and architecture that rival paid options.

Frequently Asked Questions

What is the best free React dashboard template?

Ant Design Pro is the most popular free React dashboard with 37.9k GitHub stars and enterprise-grade features backed by Alibaba. For teams using shadcn/ui, Shadcn Admin (11.1k stars) is the fastest-growing option. For Material UI projects, Devias Kit (5.6k stars) is the community benchmark — featured on the MUI Store. The best choice depends on your UI library preference: Ant Design Pro for Ant Design, Devias Kit for MUI, Shadcn Admin for shadcn/ui, and CoreUI React for Bootstrap.

How do I create a dashboard in React?

You have two approaches: start from a template or use a framework. Templates like Apex or Shadcn Admin give you pre-built pages (charts, tables, forms, auth) that you customize — best when you need to ship fast. Frameworks like Refine or React Admin provide composable components that connect to your backend API — best when you need flexibility and your dashboard will evolve significantly. Either way, pick a UI library first (MUI, shadcn/ui, Ant Design, or Tailwind CSS), scaffold with Vite or Next.js, then add a charting library (Recharts, ApexCharts, or Chart.js) and a data table solution (TanStack Table).

Is React good for building admin dashboards?

React is the most popular choice for admin dashboards in 2026, and for good reason. Its component model maps perfectly to dashboard UI patterns (reusable cards, charts, tables, forms), the ecosystem offers dozens of production-ready UI libraries (MUI, Ant Design, shadcn/ui), and state management solutions like Redux Toolkit and Zustand handle complex dashboard state well. The only real alternatives are Vue (smaller ecosystem but growing) and Svelte (newer, fewer templates available). React’s hiring pool is also the largest, which matters for team scalability.

What is the difference between a React admin template and a React admin framework?

A template (like Apex, Shadcn Admin, or Devias Kit) gives you pre-designed pages with static or mock data — you replace the data layer with your own API calls. A framework (like Refine or React Admin) gives you composable building blocks that connect directly to your backend through data providers — CRUD operations, authentication, and access control work out of the box with REST, GraphQL, Supabase, or any API. Templates ship faster for simple dashboards; frameworks scale better for complex, data-heavy admin apps that need to evolve over time.

Should I use Next.js or Vite for a React dashboard?

Use Next.js if your dashboard needs server-side rendering (SSR), SEO-friendly pages, API routes, or middleware for authentication. This applies to customer-facing dashboards, SaaS products, or any admin panel served at a public URL. Use Vite (client-side SPA) if your dashboard is internal-only, sits behind authentication, and doesn’t need SEO — Vite builds faster and the development experience is snappier. Most premium templates on this list use Next.js; most free templates use Vite.

Which React UI library is best for dashboards — MUI, shadcn/ui, or Ant Design?

Material UI (MUI) has the largest component library with the most mature theming system — ideal for enterprise projects that need comprehensive, well-documented components. shadcn/ui gives you copy-paste ownership of every component with Tailwind CSS styling — ideal for teams that want full control and modern aesthetics without a heavy dependency. Ant Design is the most opinionated with the richest out-of-the-box enterprise components (ProTable, ProForm) — ideal for data-heavy business applications, especially those targeting Asian markets. All three are production-ready; the choice usually comes down to your team’s existing experience and styling preferences.

Are React dashboard templates free to use commercially?

Most free React dashboard templates on this list use the MIT license, which allows unlimited commercial use with no attribution required. Check the specific license in each repository before deploying. The premium DashboardPack templates ($69+) include a commercial license with the purchase. Notable exceptions: Tremor uses Apache 2.0 (also commercially permissive), and some templates offer a free tier with limited pages alongside a paid “Pro” version with full features.

How do I add authentication to a React dashboard template?

Several templates include authentication out of the box: Apex and the DashboardPack templates ship with 2FA, Ant Design Pro includes route-level access control, Devias Kit provides Firebase and Auth0 integration paths, and Berry offers JWT/Firebase/Auth0 auth pages. For templates without built-in auth, the most common approach is adding NextAuth.js (for Next.js projects), Clerk, or Supabase Auth. Frameworks like Refine and React Admin have built-in authentication providers that plug into any backend.

Can I use a React dashboard template with an existing backend API?

Yes — every template on this list is frontend-only and designed to connect to your own backend. Templates ship with mock/static data that you replace with API calls using fetch, Axios, or TanStack Query. The frameworks (Refine and React Admin) make this even easier with built-in data providers for REST, GraphQL, Supabase, Strapi, Firebase, and more. The typical integration pattern: replace the mock data service with API calls, update TypeScript interfaces to match your response shapes, and wire up authentication to your auth provider.

What should I look for when choosing a React dashboard template?

Evaluate these factors in order: (1) UI library match — pick a template built on the design system your team already knows; (2) Active maintenance — check the last commit date and open issues; (3) TypeScript support — non-negotiable for production dashboards in 2026; (4) Auth and routing — built-in auth saves weeks; (5) Component quality — test the live demo on mobile, check responsive behavior; (6) Documentation — poor docs mean slow onboarding; (7) Bundle size — run a production build and check the output. Star counts indicate community size, not code quality — several lower-starred templates on this list deliver architecture that rivals paid options.

Related reading: React SaaS templates · React portfolio templates · React ecommerce templates · Next.js SaaS templates · Next.js admin dashboards with shadcn/ui · Analytics dashboard templates.

!– /wp:paragraph –>

Related reading: our Ant Design admin templates roundup.

Aigars Silkalns
Aigars Silkalns

Frontend web developer and founder of Colorlib, the team that maintains AdminLTE, one of the most popular open-source admin dashboard templates on GitHub (originally created by Abdullah Almsaeed). Over 10 years of experience building web applications with Bootstrap, React, Vue, Angular, Tailwind CSS, and WordPress. Also runs DashboardPack.